Welcome to the Newsroom

Here you will find the latest stories from our construction sites, highlights from our team members, ad hoc announcements and press releases on everything that moves us.
© STRABAG
© STRABAG

STRABAG continues upgrade of S19 expressway in Poland for € 85 million

  • 14 km long section in design-and-build process
  • Contract value of approx. € 85.5 million
  • Part of European north-south transport axis Via Carpatia

Vienna/Warsaw, 24 February 2022---STRABAG, the European construction technology group, has received another major contract in Poland. The General Directorate for National Roads and Motorways (GDDKiA) has awarded the construction of a further approx. 14 km section of the S19 expressway to the Polish STRABAG subsidiary STRABAG Sp. z o.o.
The contract, to be implemented over a period of 42 months as a design-and-build project, represents a further expansion of the European transport axis Via Carpatia between Klaipėda in Lithuania and Thessaloniki in Greece. The project comprises two planning stages: approx. 7.5 km of new roadway plus a further 6.2 km upgrade of the right-hand carriageway of the Międzyrzec Podlaski bypass as part of the bypass road’s second construction stage.
The construction includes the renewal of two exits and six civil engineering structures, including several passages for animals and amphibians, as well as two rest areas plus additional technical infrastructure and facilities for environmental protection. Along the Międzyrzec Podlaski bypass section, which is being widened to include an additional lane, the contract also foresees construction of a railway overpass as well as noise barriers, among other things.
STRABAG has already realised 41 km of Via Carpatia
“The Via Carpatia motorway network is an important north-south link in Europe from the Baltic to the Mediterranean Sea. STRABAG has played a major role in the construction so far,” says Thomas Birtel, CEO of STRABAG SE. The company has already built 41 km of motorway between Lublin and Rzeszów, which were opened to traffic at the end of last year. In 2021, contracts were also signed for three sections of the S19 for a total of 38 km.

Download Press Kit as ZIP Download

Download Press Release as PDF Download

STRABAG SE is a European-based technology group for construction services, a leader in innovation and financial strength. Our activities span all areas of the construction industry and cover the entire construction value chain. We create added value for our clients by taking an end-to-end view of construction over the entire life cycle – from planning and design to construction, operation and facility management to redevelopment or demolition. In all of our work, we accept responsibility for people and the environment: We are shaping the future of construction and are making significant investments in our portfolio of more than 250 innovation and 400 sustainability projects. Through the hard work and dedication of our approximately 86,000 employees, we generate an annual output volume of around € 19 billion.
Our dense network of subsidiaries in various European countries and on other continents extends our area of operation far beyond the borders of Austria and Germany. Working together with strong partners, we are pursuing a clear goal: to design, build and operate construction projects in a way that protects the climate and conserves resources. More information is available at www.strabag.com.

The STRABAG Group has been present in Poland since 1987. The company employs approximately 6,500 people and generates an output volume about € 1.1 billion in the country. More information is available at www.strabag.pl