STRABAG wins € 110 million large-scale contract to equip the Karawanks Tunnel
11 July 2024
- ASFINAG commissions € 110 million contract
- Karawanks Tunnel to be equipped with tunnel technology and safety installations
- Success in Europe-wide tender
Equipment with operational and safety installations
All of the lighting, ventilation, fire detection systems, extinguishing systems, traffic lights, escape route signage, video surveillance, equipment for the operating stations and electronics, sensors, power supply and the connection to the monitoring centres of ASFINAG and the Slovenian DARS will be installed in the coming months.
Works to begin at the end of 2024
Following structural refurbishment of the existing tunnel tube by mid-2027, the installation of the electrical and mechanical equipment in the existing tube will be continued. The Karawanks Tunnel is to be completed and in operation with unidirectional traffic by the end of 2028.