Welcome to the Newsroom

Here you will find the latest stories from our construction sites, highlights from our team members, ad hoc announcements and press releases on everything that moves us.
© STRABAG
© STRABAG

STRABAG AG awarded Lot 6 of Limmat Valley rail line in Dietikon West

  • LIMBA consortium (STRABAG AG, Cellere Bau AG)
  • Contract value: approx. CHF 58 million (~ € 51 million)
  • Project schedule: September 2019 through December 2022

Schlieren, 8 May 2019----STRABAG AG has been awarded the contract to build the Limmattalbahn (Limmat Valley rail line) in Dietikon West (Lot 6). The Limmat Valley is one of the most dynamic and fastest-growing regions in the greater Zurich/Aargau area. The region is already at its capacity in terms of traffic. And it will continue to grow. By the year 2030, the regional planning authorities expect more than 113,000 additional journeys per day compared to 2010. The population is expected to increase by 33 %, with a 32 % growth in the workforce.

“We are pleased to be able to make a decisive contribution to relieving the traffic situation in the greater Zurich area together with our consortium partner Cellere,” says Urban Jordan, technical director for civil engineering at STRABAG AG. “Shifting the traffic growth from road to rail also increases the attractiveness of the entire region.”

Central project elements of the works at Lot 6 include the redesign of the intersections Überlandstrasse/Badenerstrasse and Mutschellenstrasse/Industriestrasse. A 400 m long two-lane underpass will be built at Überlandstrasse/Badenerstrasse. The actual intersection will remain at the surface, with the rail line crossing the entire intersection. At Mutschellenstrasse/Industriestrasse, the rail line will pass over a bridge and Mutschellenstrasse will be lowered. This will require, among other things, the construction of a 300 m long retaining wall opposite Niderfeld.

In addition to road and track construction, including utility line refurbishment and drainage, the main works also include the construction of three stations and modifications of the Reppisch Bridge.

Visualisation of the Limmat Valley rail line Architron GmbH, Zürich
Visualisation of the Limmat Valley rail line Architron GmbH, Zürich

STRABAG AG awarded Lot 6 of Limmat Valley rail line in Dietikon West

jpg ∙ 5 MB

Download Press Kit as ZIP Download

Download Press Release as PDF Download

STRABAG SE is a European-based technology group for construction services, a leader in innovation and financial strength. Our activities span all areas of the construction industry and cover the entire construction value chain. We create added value for our clients by taking an end-to-end view of construction over the entire life cycle – from planning and design to construction, operation and facility management to redevelopment or demolition. In all of our work, we accept responsibility for people and the environment: We are shaping the future of construction and are making significant investments in our portfolio of more than 250 innovation and 400 sustainability projects. Through the hard work and dedication of our approximately 86,000 employees, we generate an annual output volume of around € 19 billion.
Our dense network of subsidiaries in various European countries and on other continents extends our area of operation far beyond the borders of Austria and Germany. Working together with strong partners, we are pursuing a clear goal: to design, build and operate construction projects in a way that protects the climate and conserves resources. More information is available at www.strabag.com.

STRABAG Switzerland has around 1,000 employees at over 20 locations in the country. With an innovative and broad range of services, we are a competent partner for projects of any kind. We bring together people, materials and machinery at the right place and at the right time. Thanks to the strength of our teams, our know-how and our international network, we realise even complex projects with success.